Roadmapmainnet live · chain 7628 · phase 4 in progress

Three phasesshipped. Onein flight.

No vague promises. Each phase has a scope and milestones, and every milestone maps to public commits. The rail below moves as you read.

Chain & consensusdone
Shielded protocoldone
Ethereum bridgedone
Order book DEXdone
Multi-chain expansion15%
Security auditpending
block mainnet
Q1 26Q2 26Q3 26Q4 262027 TODAY PHASE 1PHASE 2PHASE 3PHASE 4BEYOND
phasePhase 1
whenQ1 2026
statuscomplete
Phase 1 · Q1 2026

Testnet launch

A live EVM-compatible chain on Cosmos SDK consensus, public tooling, and the full validator incentive model.

  • Testnet chain 76287 — EVM + Cosmos SDK
  • Explorer and staking dApp
  • MetaMask one-click network add
  • Top-50 validator set, unlimited registrations
  • Faucet and public RPC endpoints
Phase 2 · Q2 2026

Shielded transfer protocol

The privacy core: a Noir circuit proven with UltraHonk, ShieldedPool v1.4 deployed, and the shield → send → unshield round-trip verified on chain.

  • ShieldedPool v1.4 with Poseidon-2 Merkle tree
  • Browser proving — Noir wasm in the staking dApp
  • MetaMask sign-to-derive viewing keys
  • Explorer shielded-transaction view
  • 17 Foundry tests across hasher and pool
Phase 3 · Jun 2026

Mainnet genesis, bridge & DEX

Mainnet at chain 7628 on 22 June. Hyperlane bridge to Ethereum with 14 bridged assets, Uniswap V2 DEX and LP farm, .snct names, airdrop indexer.

  • Mainnet genesis — 1B SNCT across ten buckets
  • Hyperlane bridge, 14 bridged ERC-20s
  • Uniswap V2 DEX + MasterChef LP farm
  • .snct name service
  • Airdrop indexer + eligibility checker
Phase 4 · Q3 2026

Order book, multi-chain & hardening

The on-chain order book shipped in July. Now: bridge expansion, a multi-validator ISM, audit completion and the airdrop distributor.

  • On-chain central limit order book (July)
  • Bridge expansion — Base, Arbitrum, Optimism, BSC, Polygon
  • Multi-validator ISM — 2-of-3 for bridge security
  • AirdropDistributor — registered-claim model
  • Security audit completion
  • Protocol-governance Safe migration (3-of-5)
Beyond · 2027 →

Owned by its community

From genesis the network is governed on chain. Directions below are proposals to be argued and voted, not promises.

Private contract executionMobile SDKIBC bridgingCompliance toolingL2 rollup supportZK identityPrivacy DEXSolana bridge

Follow the build.

Every commit is public. Watch the repo, join the community, or read the docs to stay current.